| 857 |
2025-10-25 |
Nguyễn Mạnh Cường |
|
Trong khi run ống tubing 4-1/2” , khi operator đang nâng ông lên bằng Single Joint tôi quan sát thấy pin chốt cửa của SJ bị lắp lệch , có thể bị rơi ra và làm rơi ống , rất nguy hiểm
Tôi đã ra hiệu cho operator dừng lại và hạ xuống để đưa chốt pin vào đúng vị trí để đảm bảo an toàn |
Khác... |
HWU |
HWU |
Main Deck |
Ngày |
Unsafe |
|
| 856 |
2025-10-25 |
Anurak Phetrak |
Good teamwork after finished job housekeeping area. |
|
HWU |
HWU |
HWU |
Main Deck |
Đêm |
Safe |
|
| 855 |
2025-10-25 |
Praveep Narangsee |
|
Found the water after raining can slip falls hazard. Corrective action cleaning working area to prevent slippery falls. |
HWU |
HWU |
HWU |
Main Deck |
Đêm |
Unsafe |
|
| 854 |
2025-10-24 |
Lê trọng nghĩa |
|
Observed a person walking through the door of the accommodation area and pushing the door through. The person behind him just stepped forward, risking the door hitting the person behind him. I helped warn him of that danger. |
Khác... |
Others... |
Operations |
Phòng hút thuốc |
Đêm |
Unsafe |
|
| 853 |
2025-10-25 |
Nithiwat Thongto |
Observed team good communication while RIH ESP. |
|
HWU |
HWU |
HWU |
Main Deck |
Đêm |
Safe |
|
| 852 |
2025-10-25 |
Aongart |
Observed team good wear full PPE all time on the working area. |
|
HWU |
HWU |
HWU |
Main Deck |
Ngày |
Safe |
|
| 851 |
2025-10-25 |
Prasert Adam |
|
Found the incorrect waste separation at the bin in front of chang room. Corrective action to separate it correctly and remind team before throw check bins first. |
HWU |
HWU |
HWU |
Main Deck |
Đêm |
Unsafe |
|
| 850 |
2025-10-25 |
Pariyat Srihata |
|
Observed tonight have raining after raining have some water all working area can slip while walking on working. Corrective action cleaning working area before start operation again. |
HWU |
HWU |
HWU |
Main Deck |
Đêm |
Unsafe |
|
| 849 |
2025-10-25 |
Assanee Pimpeang |
Colleague inspected the safety harness before use. |
|
HWU |
HWU |
HWU |
Main Deck |
Đêm |
Safe |
|
| 848 |
2025-10-25 |
Thawat Buaking |
Observed team before start work cleaning working area. |
|
HWU |
HWU |
HWU |
Main Deck |
Đêm |
Safe |
|
| 847 |
2025-10-25 |
Viruch phromkana |
Good communication while RIH ESP and good handover day shift and night shift. |
|
HWU |
HWU |
HWU |
Main Deck |
Đêm |
Safe |
|
| 846 |
2025-10-25 |
Hendra |
|
Observed single joint that picking up tubing up side down position. It's danger caused maybe safety pin will come out. Told Jack operator to bring it down and crew on the deck can fix it before pick it up again |
Khác... |
HWU |
HWU |
Main Deck |
Ngày |
Unsafe |
|
| 845 |
2025-10-25 |
Nguyen Hoang Quy |
|
Observation:
During running 4 1/2” tubing, single joint elevator was found installed in reverse position – unsafe condition, potential for equipment damage or pipe drop.
Action Taken:
Stopped the job, lowered tubing, and reinstalled single joint elevator correctly.
Job resumed safely. |
Khác... |
HWU |
HWU |
Main Deck |
Đêm |
Unsafe |
|
| 844 |
2025-10-25 |
Nguyen Hoang Quy |
Deck crew observed working safely and following proper procedures. |
|
Khác... |
HWU |
HWU |
Main Deck |
Đêm |
Safe |
|
| 843 |
2025-10-24 |
Hoang, Do Minh CPL SLB |
Found that the shaft of the lock open clip of the airlock door from Accommodation to maindeck has been loosen and fell out. That make the door not working properly, the latch of the door will be damaged very soon because of impact. I came to the mechanic shop and ask them to fix the shaft to make the lock open clip work properly. They agreed and fix the problem together. |
|
Khác... |
HWU |
HWU |
Main Deck |
Ngày |
Safe |
|